About the project

  • Date: August 2023
  • Client: Privida Energy Limited
  • Category:
  • Address: Ejule Alla/All Ejima Community, Kogi State, Nigeria

Solar Modules: 231.625kWp

Hybrid Inverter: 200kW

Battery: 537.6kWh

Diesel generator: 220kVA

The solar package was designed to provide power for the entire community of about 1000   households 24/7.

The diesel generator was provided to ensure availability of power during extended cloudy/rainy days and during maintenance.